Case study
Lossiemouth East Beach Footbridge
Client:
Moray Council
Consultant:
Soiltechnics
Project length:
1 week
Project Value:
£12,000
Project description:
Phoenix Drilling were instructed to undertake a ground investigation for the construction of a replacement footbridge to regain access to the East Beach. The previous bridge was closed over a year ago on safety grounds and as an iconic part of the Moray coastline the local community are keen to have access reinstated. With boreholes located both land side and beach side we worked around tide constraints using our modular rig and support from our Hagglund BV206 all-terrain vehicle to gain access to positions during low tide.
The works comprised of:
2no ‘land side’ cable percussion boreholes
2no ‘beach side’ cable percussion boreholes
Use of Hagglund BV206 support vehicle
In-situ testing
Geotechnical sampling
Working around tide constraints




Case Studies
Read about successful projects carried out by Phoenix.
A701 Relief Road and A702 Spur Road, Midlothian
Case study A701 Relief Road and A702 Spur Road, Midlothian Client: Midlothian Council Consultant: RPS Project length: November 2017 to April 2018 Project Value: £180,000 Project description: Phoenix Drilling Limited was appointed to carry out an intrusive ground...
Provanmill, Glasgow
Case Study Provanmill, Glasgow Client: Scottish Prison Service Consultant: Mason Evans Partnership Project length: November 2017 – December 2017 Project Value: £60,000 Project description: Phoenix Drilling were appointed as principle contractor and instructed to...