Case study
Lossiemouth East Beach Footbridge
Client:
Moray Council
Consultant:
Soiltechnics
Project length:
1 week
Project Value:
£12,000
Project description:
Phoenix Drilling were instructed to undertake a ground investigation for the construction of a replacement footbridge to regain access to the East Beach. The previous bridge was closed over a year ago on safety grounds and as an iconic part of the Moray coastline the local community are keen to have access reinstated. With boreholes located both land side and beach side we worked around tide constraints using our modular rig and support from our Hagglund BV206 all-terrain vehicle to gain access to positions during low tide.
The works comprised of:
2no ‘land side’ cable percussion boreholes
2no ‘beach side’ cable percussion boreholes
Use of Hagglund BV206 support vehicle
In-situ testing
Geotechnical sampling
Working around tide constraints




Case Studies
Read about successful projects carried out by Phoenix.
Ground Investigation for Beauly to Peterhead 400kV Transmission Line Upgrade
Case studyGround Investigation for Beauly to Peterhead 400kV Transmission Line UpgradeClient: SSEN Consultant: Card Geotechnics Ltd Project length: July 2024 – Summer 2026 Project Value: £3.5 millionProject description: Phoenix Drilling Limited was appointed by CGL...
King George V Docks, Glasgow Redevelopment
Case study King George V Docks, Glasgow Redevelopment Client: Ramboll UK Limited Project length: 3 weeks Project Value: £20,000Project description: Phoenix Drilling were appointed by Ramboll UK Limited to undertake an investigation on the King George V Docks. This is...
Ground Source Heating Project, Poplar Park, South Lanarkshire.
Case study Ground Source Heating Project, Poplar Park, South Lanarkshire. Client: Private Individual Consultant: N/A Project length: 1 week Project Value: £14,000 Project description: As part of a Ground Source Heating Project in South Lanarkshire, Phoenix Drilling...