Ground Source Heating Project, South Lanarkshire

June 26, 2019

As part of a Ground Source Heating Project in South Lanarkshire, Phoenix Drilling was commissioned to drill and install two 200m deep boreholes within a landscaped garden. The project had to be carefully planned to ensure all lawns, fencing and decorative block were protected throughout the course of the work. On concluding the project the client awarded the Heating Contractor a 5-star review for the works with an added recommendation for the drilling operation.

Read the full project case study: https://phoenixdrilling.co.uk/ground-source-heating-project-poplar-park-south-lanarkshire/

Related Posts

Pacific Quay, Glasgow

Pacific Quay, Glasgow

Phoenix Drilling have been appointed to drill beside Glasgow’s iconic Science Tower and I-Max cinema. This follows on from previous works undertaken...

read more
Glenmore, Glenborrodale.

Glenmore, Glenborrodale.

Our Fraste XL Max and crew arriving on site at Glenmore, Glenborrodale which is a coastal community on Loch Sunart in the South of the Ardnamurchan...

read more
Glenboig, North Lanarkshire.

Glenboig, North Lanarkshire.

Our soils crew setting up our light weight Consallen Forager soils rig mounted on a Hagglund BV206. The rotary works were also assisted by use of a...

read more

Get in touch

We would love to hear from you

Call us today