CHAS Premium Plus Accreditation for Phoenix Drilling.

CHAS Premium Plus Accreditation for Phoenix Drilling.

Phoenix Drilling are delighted to announce that we have been awarded CHAS Premium Plus Certification, fantastic effort from all the team!

CHAS Premium Plus accreditation places a the focus on maintaining high standards of health and safety within our business. The Premium Plus accreditation is for those companies who have been able to prove that they take their commitments beyond the basic level.

Phoenix successfully pass ISO 45001.

Phoenix successfully pass ISO 45001.

Phoenix Drilling is delighted to announce that we have successfully passed our migration assessment to the international health and safety management system ISO 45001.

In addition to achieving ISO 45001, we have also successfully passed our recertification assessment for ISO 9001 (Quality) and ISO 14001 (Environmental) management systems.

Our integrated management systems policies, processes and procedures ensures that HSEQ is part of our culture, overall business strategy as well as our day-to-day operations.

We would like to thank Samantha McLeary and all staff involved with assessment and recognise that it is a testament to the Company’s policies, processes and overall commitment to satisfying customer requirements.
Our ISO certification scope includes drilling, boring and geothermal activities relating to all Phoenix Drilling site operations, support processes, equipment and rigs.

Thanks to the UKAS Accreditation Certification Body NQA for undertaken the assessment.

Thanks to Accendo Consultants (www.accendo.org.uk) for the auditing and consultancy support.

Lossiemouth East Beach Footbridge

Lossiemouth East Beach Footbridge

Case study

Lossiemouth East Beach Footbridge

Client:

Moray Council

Consultant:

Soiltechnics

Project length:

1 week

Project Value:

£12,000

Project description:

Phoenix Drilling were instructed to undertake a ground investigation for the construction of a replacement footbridge to regain access to the East Beach. The previous bridge was closed over a year ago on safety grounds and as an iconic part of the Moray coastline the local community are keen to have access reinstated.  With boreholes located both land side and beach side we worked around tide constraints using our modular rig and support from our Hagglund BV206 all-terrain vehicle to gain access to positions during low tide.

The works comprised of:

2no ‘land side’ cable percussion boreholes

2no ‘beach side’ cable percussion boreholes

Use of Hagglund BV206 support vehicle

In-situ testing

Geotechnical sampling

Working around tide constraints

Case Studies

Read about successful projects carried out by Phoenix.

Lossiemouth East Beach Footbridge

Lossiemouth East Beach Footbridge

Case study Lossiemouth East Beach Footbridge Client: Moray Council Consultant: Soiltechnics Project length: 1 week Project Value: £12,000 Project description: Phoenix Drilling were instructed to undertake a ground investigation for the construction of a replacement...

read more
A701 Relief Road and A702 Spur Road, Midlothian

A701 Relief Road and A702 Spur Road, Midlothian

Case study A701 Relief Road and A702 Spur Road, Midlothian Client: Midlothian Council Consultant: RPS Project length: November 2017 to April 2018 Project Value: £180,000 Project description: Phoenix Drilling Limited was appointed to carry out an intrusive ground...

read more

Get in touch

We would love to hear from you

Call us today

Ground Source Heating Project, Poplar Park, South Lanarkshire.

Ground Source Heating Project, Poplar Park, South Lanarkshire.

Case study

Ground Source Heating Project, Poplar Park, South Lanarkshire.

Client:

Private Individual

Consultant:

N/A

Project length:

1 week

Project Value:

£14,000

Project description:

As part of a Ground Source Heating Project in South Lanarkshire, Phoenix Drilling was commissioned to drill and install two 200m deep boreholes within a landscaped garden. The project had to be carefully planned to ensure all lawns, fencing and decorative block were protected throughout the course of the work. On concluding the project the client awarded the Heating Contractor a 5-star review for the works with an added recommendation for the drilling operation.

The works comprised of:

2 No rotary boreholes to depths of 200m bgl

Installation of geothermal looped pipe

Adequate protection of private landscaped garden area

Building successful working relationship with industry contractors

Case Studies

Read about successful projects carried out by Phoenix.

Lossiemouth East Beach Footbridge

Lossiemouth East Beach Footbridge

Case study Lossiemouth East Beach Footbridge Client: Moray Council Consultant: Soiltechnics Project length: 1 week Project Value: £12,000 Project description: Phoenix Drilling were instructed to undertake a ground investigation for the construction of a replacement...

read more
A701 Relief Road and A702 Spur Road, Midlothian

A701 Relief Road and A702 Spur Road, Midlothian

Case study A701 Relief Road and A702 Spur Road, Midlothian Client: Midlothian Council Consultant: RPS Project length: November 2017 to April 2018 Project Value: £180,000 Project description: Phoenix Drilling Limited was appointed to carry out an intrusive ground...

read more

Get in touch

We would love to hear from you

Call us today

Ground Source Heating Project, South Lanarkshire

Ground Source Heating Project, South Lanarkshire

As part of a Ground Source Heating Project in South Lanarkshire, Phoenix Drilling was commissioned to drill and install two 200m deep boreholes within a landscaped garden. The project had to be carefully planned to ensure all lawns, fencing and decorative block were protected throughout the course of the work. On concluding the project the client awarded the Heating Contractor a 5-star review for the works with an added recommendation for the drilling operation.

Read the full project case study: https://phoenixdrilling.co.uk/ground-source-heating-project-poplar-park-south-lanarkshire/